My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-02_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2009-02-02_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:19 AM
Creation date
2/10/2009 8:34:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
2/2/2009
Doc Name
Final reclamation cost estimate
From
DRMS
To
Natural Soda, Inc.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />with <br />BULLDOZE GQS -'.' ,r=y ?s-r <br />PROJECT IDENTIFICAT€O['4 <br />Task #: 04a State :Colorado Permit/job4t:M-1983-194 <br />Date : 0111212009 County :Rio-Blanco----- - - - __ Abbreviation :none <br />-- -- -------- - - --- ------ <br />User : THM Site :Natural Soda, Inc. Filename :M194-04a <br />Data source : (CRG) <br />Source of estimated volume :6" topsoil over 6.91 acres <br />Source of estimated swell factor :NA <br /> <br /> <br />HOURLY PRODUCTION <br /> <br />Job Condition Correction Factors urce :.... <br /> <br />So <br /> operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production :- -634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient: 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />_ <br />Average site altitude : 6,600 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 600 <br />1 Ibs/LCY Net correction : 0.96 <br /> , <br />Weight description <br />Top Soil Adjusted unit production : 607.56 LCY/hr <br /> Adjusted fleet production : 1,215.12 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 4.59 Hours <br />Unit cost : $0.264 /LCY Total job cost : $1,470 <br />
The URL can be used to link to this page
Your browser does not support the video tag.