Laserfiche WebLink
<br />c"N'31GES Cost <br />PRQi.ECT {DENT IFICA T ION <br />Task 1# : 03a State :Colorado Permit/job# :M-1983-19 <br />Date : 0111212009- County :Rio Blanco-------- - Abbreviation :none-- <br />User : THM Site :Natural Soda, Inc. Filename :M19 = a - <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis :-I per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cost/hour : $320.44 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />600 CCY factor : <br />: 16 <br />l 1.115 volume : 18,509 LCY <br />, <br />ume <br />vo <br />Source of estimated volume : TR-26 well pad design figure <br />Source of estimated swell factor :CAT Handbook <br /> <br />:.:.:..::::::......::::::.::,.:...:.... .... <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.11 jC <br />at <br />HB) <br />Average push gradient : 5.00 % (neg) Altitude 1.00 C <br />at HB) <br />Average site altitude : 6, 600 feet Material weight : 082 Cat <br />HB) <br /> Blade type : 1.00 (S/SU/U) <br />ht : <br />i <br />l <br />t <br />i <br />M 800 Ibs/LCY <br />2 Net correction : 0.46 <br />we <br />g <br />a <br />er <br />a , <br />Weight description <br />Adjusted unit production : <br />289.31 <br />LCY/hr <br />Clay - Natural bed <br /> Adjusted fleet production : 578.63 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 31.99 Hours <br />Unit cost :- 554 /LCY <br />--i0 Total job cost : $10,250 <br /> -