Laserfiche WebLink
.. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Transportation Cycle Time <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />Equipment <br />Nearest major city or town within project area region : Hayden <br />Total one-way travel distance : 12.0 miles <br />Roadable Average travel speed : 35.0 mph <br />Non- <br />Roadable <br />Equipment <br />0.34 <br />0.34 <br />0.50 <br />0.50 <br />1.69 <br />0.34 Total non-roadable mob/demob cost " <br />0.34 `two round trips with haul rig <br />NA Total roadable mob/demob cost "" <br />NA "one round trip, no haul rig <br />0.69 <br />$1,195.50 <br />$0.00 <br />JOB TIME AND COST Total job time : 3.37 hours <br />Total job cost : $1,195 <br />rl: ~ I <br />~~ ~,, ~ ~- <br />EQUIPMENT HAUL DISTANCE and TIME <br />