My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-03_PERMIT FILE - C1992081A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-12-03_PERMIT FILE - C1992081A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:32 PM
Creation date
2/5/2009 2:00:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/3/2008
Doc Name
Railcar Load-In Operations Bond Estimate Worksheets (Approved TR6, but not Implemented)
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />...BULLDOZER RIPPING WORK :.::::::::::::::,:::::::.::::.::::.::::.:::::::::<:<::.:.: ;;;;;:.;::.;::.;;;;;:.::.;;;;:.;;:.;; <br />PROJECT IDENTIFICATION <br />Task # : 007 State :Colorado Permit/job # : C9992-089 <br />Date <br />User <br />County :Routt <br />Site : Hq Load Out <br />Abbreviation :none <br />Filename : C081-007 <br />05/09/2008 <br />JHB <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN3 <br />Task description : Pvip i'~aul f2oads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume <br />Area : 3.33 acres Rip depth (ft) : 2.50 Volume <br />A9~1 <br />93,439 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Division estimate <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 3,378.18 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.50 feet/pass Site altitude : 6,400 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat Hl3) <br />Average ripping length : 200.00 feetlpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.838 acres/hour Adjusted unit production : 2,803.89 cu. yds./hour <br />Unadjusted production : 3,378.18 cu. yds./hour Adjusted fleet production : 2,803.89 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 4.79 hours <br />Unit cost : $0.076 per cu. yd. Total job cost : $9,026 <br /> <br /> <br />.::::.::::::::::::::::::.::..:: <br />.......................................................................... <br />RN-03 <br />::.::::::::::::::::: <br />..................... <br />::.::::..:::.::::::.::.:.: <br />.............................. <br />.'':.:::::::.:.::::::.:::::::::::..................................... <br />........................................................................ <br />..3-1.6 <br />............................. <br />............................. .<;:.;;evised 06/08.: <br />R <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.