2008-12-03_PERMIT FILE - C1992081A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-12-03_PERMIT FILE - C1992081A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:32 PM
Creation date
2/5/2009 2:00:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/3/2008
Doc Name
Railcar Load-In Operations Bond Estimate Worksheets (Approved TR6, but not Implemented)
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLDOZER RIPPING WORK <br />......................................................................................................................................... . <br /> PROJECT IDENTIFICATION <br /> Task # : 006 State :Colorado Permit/job # : C1992-081 <br /> Date : 05/09/2008 County :Routf Abbreviation :none <br /> User : JHB Site :Hg Load Out Filename :C081-006 <br /> <br /> Agency or organization name :Division Of Reclamation, Mining And Safety <br /> Permit or other job action : RN3 <br /> Task description :Rip FaciOefies Area <br /> <br /> HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cost/hour : $70.58 NA <br /> Dozer operating cost/hour : $103.27 100 <br /> Ripper operating cost/hour : $7.52 100 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $214.14 Total fleet cost/hour : $214.14 <br /> >'> ..................................................................................~........................................................................ <br />~ ............ <br /> MATERIAL <br />QUANTITIES <br /> Selected estimating method : Area <br /> Alternate methods - <br /> Seismic : NA NA Load factor : NA Bank volume : lUA BCY <br /> Area : 13.50 acres Rip depth (ft) : 2.50 Volume : 54,450 BCY or CCY <br /> Source of estimated quantity :Tab 23, p.4 <br /> Source of estimated load factor : NA <br /> <br /> HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />NA feet/second Unadjusted production <br />NA cu. yds./hour per selected method <br />2.50 feet/pass Site altitude <br />7.67 feet/pass Altitude adjustment <br />200.00 feet/pass Job efficiency factor <br />88.00 feet/minute Net job correction <br />0.25 minutes/pass <br />0.838 acres/hour Adjusted unit production <br />3,378.18 cu. yds./hour ~ Adjusted fleet production <br />3,378.18 cu. yds./hour <br />6,400 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />2,803.89 cu. yds./hour <br />2,803.59 cu. yds./hour <br />~~~ ~~~~~TIME AND COST <br />JOB <br />Fleet size : 1 dozers) Total job time : 19.42 hours <br />Unit cost : $0.076 per cu. yd. Total job cost : $4,159 <br />...............:::::.: <br />............................................................................................................................................................................................ ............................ .. ;;:.;:.;:/0:8:: <br />' ~ed 06 <br />RN-03 23-1.5 Revis <br />
The URL can be used to link to this page
Your browser does not support the video tag.