Laserfiche WebLink
• <br />Hayden Gulch Load Out <br />C1992-081 <br />Permit Renewal No. 3 <br />May 30, 2008 <br />JHB <br />Task 41: Site Maintenance $5,255.00 <br />Assume use of a Caterpillar D3C dozer two days per year (16 hours) every two years (5 times) <br />over the liability period for rill & gully repair and minor site maintenance. The hourly rate for a <br />Cat D3C is $65.69 (2008 CIRCES costs). <br />80 hours X $65.69 = $5,255.00 <br />• <br />r, <br />u <br />RN-03 <br />23-1.29 <br />Revised 06/08 <br />