Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name :Division Of Reclamation, Mining And Safety <br />Task # : 037 State :Colorado Permit/job# : C1992-089 <br />Date : 13-May-2008 County : Rouff Abbreviation :none <br />User : JHB Site : Hg Load Out Filename : C81 -037 <br />Permitting action : RN3 <br />Task description : ®elrtOllSlt 3'$tlCtUfeS (TY~6 appPOVa15) <br />............................................................................................................ ... .... _... .. .... ....... :a::~:o a:r:~...... <br />>:;:0:;:•: o-Locat n <br />,; „ent.,.,, 92.32/ <br />~io ad'ustm <br />~~207 <br />ate . ~ Ma <br />u it cost u d <br />UNIT COSTS Last n p Y, J <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-Truck Dump Hopper 6600 Demoldisp./appr. dump - to 5 mi. 6,600.00 CF 81.0437 $6,888.49 <br />-concrete floor 18" th. x 495 sq.ft. Demoldisp. exs. pif, 4" fh.- 50 R. 495.00 SF $1.1173 $553.08 <br />-foundation watts 30" 7963 Demo./disp. exs. pit, 1.5x2' 50 ft. 7,963.00 LF $10.0559 $80,075.33 <br /> <br />-Reclaim Tunnel 36"belt vibrator 12 Demo./disp. exs. pit, 1.5x3'- 50 ff. 12.00 LF $15.0839 $181.01 <br /> <br />-Dump Hopper Conveyor Tunnel 10' dia. x 115 ft. Ref. wall, steel - 12. i' D x 20' H 115.00 LF $50.0000 $5,750.00 <br /> <br />-dump Hopper Conveyor 147 Lin. Ft. Conveyor, elevated - 8' W x 10' H 147.00 LF $45.3900 $6,672.33 <br /> <br />-Crusher building 20160 cubic feet Demoldisp./appr. dump - to 5 mi. 20,160.00 CF $1.0437 $21,041.20 <br />-crusher floor 12" th. 672 sq. R. Demo./disp. exs. pit, 12" th.-200 R. 672.00 SF $3.3890 $2,277.39 <br /> <br />-Powerhouse (2) 2240 cubic feet Demoldisp./appr. dump - to 5 mi. 2,240.00 CF $1.0437 $2,337.91 <br />-powerhouse floors 224 sq. ff. Demoldisp. exs. pit, B" the 200 ft. 224.00 SF $2.2593 $506.09 <br /> <br />-Dust Supp2ssion Pressu2 Tank Building 1344 Cubic Feet Demoldisp./appr. dump - to 5 mi. 1,344.00 CF $1.0437 $1,402.75 <br />-Boor of Dust suppression building 192 sq, R. X8" th. Demoldisp. exs. pit, 8" the 200 ft. 192.00 SF $2.2593 $433.79 <br /> <br />-Dust suppression System building 672 cubic feet Demo./disp./appr. dump - to 5 mi. 672.00 CF 81.0437 $701.37 <br />-floor of dust suppression system building 96 Demo./disp. exs. pit, 8" th.- 200 ft. 96.00 SF $2.2593 $216.89 <br /> <br />-Water Storage Tank 6872 Demo./disp./appr. dump - to 5 mi. 6,872.00 CF $1.0437 $7,172.38 <br /> <br />-Railroad track (loop 6 Spur) 17424 Lin. Feet Railroad track -Ties and track 17,424.00 LF $7.5400 $131,376.96 <br />ballast included in Task 1 <br />-Loadout building 63700 cu. ff. Demo./disp./appr. dump - to 5 mi. 63,700.00 CF $1.0437 $66,484.33 <br />-footings of Loadout building 130 tin. ff. Demoldisp. exs. pit, 2'x3' - 200 ft. 130.00 LF $20.3338 $2, 643.39 <br /> <br />-Loadout Belt (60° W) 290 Lin. Ft. Conveyor, overland - 5' W x 6' H 290.00 LF $15.1400 $4,390.60 <br /> <br />-Rail Car posifioner & hopper 82560 DemoJdispJappr. dump - to 5 mi. 82,560.00 CF $1.0437 $86,168.71 <br />-positioner & hyper walls 12" fh. X 584 sq. ft. Demoldisp. exs. pit, 12" th.-200 ft. 584.00 SF $3.3890 $1,979.16 <br /> <br /> <br />-Rail Car Dump Hopper Reclaim Tunnel-Sett 60°Wxf20ft.L Conveyor, overland-5'Wx6'H 120.00 LF $15.1400 $1,816.80 <br />-floor 12°th.X3360s.f. Demo./disp. exs. pit, 12"th.-fOKft. 3,360.00 SF $3.4143 $11,471.91 <br />-24° foundation walls 24" th. X 5248 s.f. Demo./disp. exs. pif, 12° th.-10K ft. 10,496.00 SF $3.7538 $39,399.79 <br /> <br />-Dump Hopper Belt conveyor Tunnel 16'dia. 106 Lin. Ff. remove converyor tunnel 106.00 LF $240.9000 $25,535.40 <br /> <br />-belt-60"w 60" W. X 146' 1 Conveyor, ovedand - 5' W x 6' H 146.00 LF $15.1400 $2,210.44 <br /> <br /> <br />-Radial stackerpad 12" th. X 3625 s.f. Demo./disp. exs. pit, 4" th.- 50 ff. 3,625.00 SF $1.1173 $4,050.30 <br />-Radial stacker boom 140 l.f. Conveyor, elevated - 5' W x 6' H 140.00 LF $37.8300 $5, 296.20 <br /> <br />-Foglet system control building 1920 s.f. Demoldisp./appr. dump - fo 5 mi. 1,920.00 CF $1.0437 $2,003.92 <br /> <br />-2 office trailers 19500cf+7200cf DemoJdispJexcav.pit-lOK'haul 26,700.00 CF $0.2132 $5,692.06 <br /> <br /> <br />-Culverts 12"culverts Pipe, CfdP- 12 in. diam. 166.00 LF $2.1737 $360.83 <br />-18° Culverts 4691.1. Pipe, CMP- 18 in. diam. 469.00 LF $2.3533 . -$1,103.71 <br />-24"culverts 940 Lf Pipe, CMP- 24 in. diam. 940.00 LF $3.1548 $2,965.52 <br />-36"Culverts 501.f. Pipe, CMP- 36 in. diam. 50.00 LF $4.8633 $243.17 <br />-42" Culverts 152 Lf Pipe, CMP- 48 in. diam. 152.00 LF $6.1925 $941.27 <br />-60" Culverts 2901.1. Pipe, CMP - 60 in. diam. 290.00 LF $13.0542 $3, 785.71 <br />-96"Culverts 1651.7. Pipe, CMP- 96 in. diam. 165.00 LF $30.8135 $5,OB4.23 <br />-102"Culverts 5851. f. Pipe, CMP-96 in. diam. 585.00 LF $30.8135 $18,025.91 <br />-108" Culverts 3301.f. <br />-108" Culverts 3301.E Pipe, CMP - 108 in. diam. 330.00 LF $42.9048 $14,158.58 <br />JOB COST Subtotal (unadjusted): 8573,399 Total Cost (adjusted for location): $529,362 <br />• <br />• <br />RN-03 23-1.28 Revised 06/08 <br />