CIRCES Cost EstimatingSoftware
<br />DEMOLITION WORK
<br />PROJECT IDENTIFICATION Agency or organization name :Division Of Reclamation, Mining And Safety
<br />Task # : 037 State :Colorado Permit/job# : C1992-089
<br />Date : 13-May-2008 County : Rouff Abbreviation :none
<br />User : JHB Site : Hg Load Out Filename : C81 -037
<br />Permitting action : RN3
<br />Task description : ®elrtOllSlt 3'$tlCtUfeS (TY~6 appPOVa15)
<br />............................................................................................................ ... .... _... .. .... ....... :a::~:o a:r:~......
<br />>:;:0:;:•: o-Locat n
<br />,; „ent.,.,, 92.32/
<br />~io ad'ustm
<br />~~207
<br />ate . ~ Ma
<br />u it cost u d
<br />UNIT COSTS Last n p Y, J
<br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST
<br />-Truck Dump Hopper 6600 Demoldisp./appr. dump - to 5 mi. 6,600.00 CF 81.0437 $6,888.49
<br />-concrete floor 18" th. x 495 sq.ft. Demoldisp. exs. pif, 4" fh.- 50 R. 495.00 SF $1.1173 $553.08
<br />-foundation watts 30" 7963 Demo./disp. exs. pit, 1.5x2' 50 ft. 7,963.00 LF $10.0559 $80,075.33
<br />
<br />-Reclaim Tunnel 36"belt vibrator 12 Demo./disp. exs. pit, 1.5x3'- 50 ff. 12.00 LF $15.0839 $181.01
<br />
<br />-Dump Hopper Conveyor Tunnel 10' dia. x 115 ft. Ref. wall, steel - 12. i' D x 20' H 115.00 LF $50.0000 $5,750.00
<br />
<br />-dump Hopper Conveyor 147 Lin. Ft. Conveyor, elevated - 8' W x 10' H 147.00 LF $45.3900 $6,672.33
<br />
<br />-Crusher building 20160 cubic feet Demoldisp./appr. dump - to 5 mi. 20,160.00 CF $1.0437 $21,041.20
<br />-crusher floor 12" th. 672 sq. R. Demo./disp. exs. pit, 12" th.-200 R. 672.00 SF $3.3890 $2,277.39
<br />
<br />-Powerhouse (2) 2240 cubic feet Demoldisp./appr. dump - to 5 mi. 2,240.00 CF $1.0437 $2,337.91
<br />-powerhouse floors 224 sq. ff. Demoldisp. exs. pit, B" the 200 ft. 224.00 SF $2.2593 $506.09
<br />
<br />-Dust Supp2ssion Pressu2 Tank Building 1344 Cubic Feet Demoldisp./appr. dump - to 5 mi. 1,344.00 CF $1.0437 $1,402.75
<br />-Boor of Dust suppression building 192 sq, R. X8" th. Demoldisp. exs. pit, 8" the 200 ft. 192.00 SF $2.2593 $433.79
<br />
<br />-Dust suppression System building 672 cubic feet Demo./disp./appr. dump - to 5 mi. 672.00 CF 81.0437 $701.37
<br />-floor of dust suppression system building 96 Demo./disp. exs. pit, 8" th.- 200 ft. 96.00 SF $2.2593 $216.89
<br />
<br />-Water Storage Tank 6872 Demo./disp./appr. dump - to 5 mi. 6,872.00 CF $1.0437 $7,172.38
<br />
<br />-Railroad track (loop 6 Spur) 17424 Lin. Feet Railroad track -Ties and track 17,424.00 LF $7.5400 $131,376.96
<br />ballast included in Task 1
<br />-Loadout building 63700 cu. ff. Demo./disp./appr. dump - to 5 mi. 63,700.00 CF $1.0437 $66,484.33
<br />-footings of Loadout building 130 tin. ff. Demoldisp. exs. pit, 2'x3' - 200 ft. 130.00 LF $20.3338 $2, 643.39
<br />
<br />-Loadout Belt (60° W) 290 Lin. Ft. Conveyor, overland - 5' W x 6' H 290.00 LF $15.1400 $4,390.60
<br />
<br />-Rail Car posifioner & hopper 82560 DemoJdispJappr. dump - to 5 mi. 82,560.00 CF $1.0437 $86,168.71
<br />-positioner & hyper walls 12" fh. X 584 sq. ft. Demoldisp. exs. pit, 12" th.-200 ft. 584.00 SF $3.3890 $1,979.16
<br />
<br />
<br />-Rail Car Dump Hopper Reclaim Tunnel-Sett 60°Wxf20ft.L Conveyor, overland-5'Wx6'H 120.00 LF $15.1400 $1,816.80
<br />-floor 12°th.X3360s.f. Demo./disp. exs. pit, 12"th.-fOKft. 3,360.00 SF $3.4143 $11,471.91
<br />-24° foundation walls 24" th. X 5248 s.f. Demo./disp. exs. pif, 12° th.-10K ft. 10,496.00 SF $3.7538 $39,399.79
<br />
<br />-Dump Hopper Belt conveyor Tunnel 16'dia. 106 Lin. Ff. remove converyor tunnel 106.00 LF $240.9000 $25,535.40
<br />
<br />-belt-60"w 60" W. X 146' 1 Conveyor, ovedand - 5' W x 6' H 146.00 LF $15.1400 $2,210.44
<br />
<br />
<br />-Radial stackerpad 12" th. X 3625 s.f. Demo./disp. exs. pit, 4" th.- 50 ff. 3,625.00 SF $1.1173 $4,050.30
<br />-Radial stacker boom 140 l.f. Conveyor, elevated - 5' W x 6' H 140.00 LF $37.8300 $5, 296.20
<br />
<br />-Foglet system control building 1920 s.f. Demoldisp./appr. dump - fo 5 mi. 1,920.00 CF $1.0437 $2,003.92
<br />
<br />-2 office trailers 19500cf+7200cf DemoJdispJexcav.pit-lOK'haul 26,700.00 CF $0.2132 $5,692.06
<br />
<br />
<br />-Culverts 12"culverts Pipe, CfdP- 12 in. diam. 166.00 LF $2.1737 $360.83
<br />-18° Culverts 4691.1. Pipe, CMP- 18 in. diam. 469.00 LF $2.3533 . -$1,103.71
<br />-24"culverts 940 Lf Pipe, CMP- 24 in. diam. 940.00 LF $3.1548 $2,965.52
<br />-36"Culverts 501.f. Pipe, CMP- 36 in. diam. 50.00 LF $4.8633 $243.17
<br />-42" Culverts 152 Lf Pipe, CMP- 48 in. diam. 152.00 LF $6.1925 $941.27
<br />-60" Culverts 2901.1. Pipe, CMP - 60 in. diam. 290.00 LF $13.0542 $3, 785.71
<br />-96"Culverts 1651.7. Pipe, CMP- 96 in. diam. 165.00 LF $30.8135 $5,OB4.23
<br />-102"Culverts 5851. f. Pipe, CMP-96 in. diam. 585.00 LF $30.8135 $18,025.91
<br />-108" Culverts 3301.f.
<br />-108" Culverts 3301.E Pipe, CMP - 108 in. diam. 330.00 LF $42.9048 $14,158.58
<br />JOB COST Subtotal (unadjusted): 8573,399 Total Cost (adjusted for location): $529,362
<br />•
<br />•
<br />RN-03 23-1.28 Revised 06/08
<br />
|