Laserfiche WebLink
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task # : ®15 State :Colorado Permitijob # : C19~2-®~9 <br />Date <br />User <br />05/09/2008 <br />JHB <br />County : Routt <br />Site :Hp Load Out <br />Abbreviation :none <br />Filename :C081-015 <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN3 <br />Task description : Fi6&®S,7D ~it'a09e QiAStB6e'lbe®9 arras <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachment no. 1 : NA <br />Attachment no. 2 : Multi-shahlc ripper <br />Cost Breakdown Ownership cost/hour <br />Grader operating cost/hour <br />Ripper operating cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />Utilization <br />$43.20 NA <br />$48.51 100 <br />$0.00 0 <br />$24.47 NA <br />Horsepower : 215 <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$116.18 Total fleet cost/hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : ~®~,5® acres <br />$99~.~~ <br />Source of estimated acreage :Total Disturbed area <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees " ' at 0 degrees, blade is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet "* *' width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 6,400 feet Altitude adjustment factor : 1.00 I (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 9.300 acres/hour <br />JOB TIME AND COST ~ <br />Fleet size : 1 grader(s) Total job time : 39.99 hours <br />Unit cost : $89.32 per acre Total job cost : $9 423 <br />RN-03 _ _ _ _ 23-1.10 __ , .._ _ _ _ .Revised 06/08 <br />