My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-03_PERMIT FILE - C1992081A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-12-03_PERMIT FILE - C1992081A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:32 PM
Creation date
2/5/2009 2:00:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/3/2008
Doc Name
Railcar Load-In Operations Bond Estimate Worksheets (Approved TR6, but not Implemented)
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Agency or organization name :Division Of Reclamation, Mining And Safety <br /> Permit or other job action : RN3 <br /> Task description : Rege'~de R~~'-p R®a~s <br /> <br /> HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $71.49 NA <br /> Operating cosUhour : $103.27 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br /> ATERIAL. ~UANTITIES [ ..................................................................................................................................... <br />M Q ............................... ............................ <br /> Initial Swell Loose <br /> volume : 4,400 CCY factor : 1.125 volume : 4,950 LCY <br /> <br /> Source of estimated volume :Division estimate (TR6) <br /> Source of estimated swell factor :Caterpillar Handbook Edition <br /> <br /> _ _ _ .............................. _................._............. <br />HOURLY PRODUCTION Job Condition Correction Factors _.................... .::;.Source;::::. <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br /> Unadjusted hourly production : 1,243.2 LCYihr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (lshift/day) <br /> Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br /> Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br /> Average site altitude : 6, 400 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2, 650 Ibs/LCY Net correction : 0.39 <br /> Weight description <br /> Decomposed rock - 25% Rock, 75% Earfh Adjusted unit production : 483.43 LCYihr <br /> Adjusted fleet production : 483.43 LCY/hr <br /> <br /> <:»:>:B TIME AND COST<:> :::........................................................................................................................................... <br />JO .............................. ............................ <br /> Fleet size : 1 Dozers) Total job time : 90.24 Hours <br /> Unit cost : $0.429 /LCY Total job cost : $2,925 <br /> <br /> RN-03 23-1.9 Revised 06/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.