Laserfiche WebLink
9. ----: Bedding for Rip-Rap = ' <br />_~ a) Material -The material used for bedding will be reasonably well <br />• ~:' graded from sand site to 4 inches. Gabbles up to 4 inches In <br />maximum dimensions may be used if well distributed in the bedding, <br />The bedding materials shall not contain more than 5°5 of material passir. <br />a No. 200 United States sieve. Bedding will be placed at rip-rap <br />locations on the emergency spillway and the outlet section of the <br />conduit to a depth of one foot.. , <br />b) Placement -The contractcr's operations will be such and he <br />will handle and place the material in such a man:ier as to <br />.prevent segregation. The bedding need not be compacted in <br />place, but will be placed in such a manner as will result in <br />a uniform layer of bedding for rip-rap of the specified thickness. <br /> <br />10. Construction Monitoring - . <br />a) Owner's Representative - Afield engineer under the employ <br />of Utah International, Inc. will monitor construction quality <br />and practice on a daily basis. The field engineer will also <br />monitor slope, grade, elevation, and all other specified <br />items . <br />:~ b) Testing -All materials used in the construction process will <br />be tested as to quality within the specitications on a routine <br />basis. Each lift of placement of any material or location <br />_ will be tested. The *_ests will consist of the proper method <br />- required to control specifications for each material and the proper <br />' placement of each material. <br />11. Appurtenances <br />a) Installation -The decant, outlet conduit, gates, lift stations, <br />anchor blocks, trash racks, monitoring pins, or any other <br />hardware item ~•ailI be installed to the lines, dimensions, <br />elevations, and specifications shown. The above items will <br />be furnished by Utah International, Inc. <br />12. Reclamation <br />a) Embankment - As per House Bill ATO. 1065, Sections 34-32-103 <br />and 34-32-116 the downstream slope will be planted with the <br />following; <br />1) .Species and Seeding Rates: <br />~) ~ #PIS/AC <br />Sodar Streambank Wheatgrass q <br />-, <br />- 14 - <br />• ~ REVISED FEB 13 'g7 <br />