My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2016 7:45:10 AM
Creation date
2/5/2009 11:11:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Doc Name
Dam Construction Certifications
Section_Exhibit Name
Appendix Q Section XVI
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ ~ SPECIFICATIONS • <br />~ ~ The dam is to be of a zoned design• consisting of a rolled earth fill embankment. <br />'•~~The ma:cimum height will be approximately 45 feet, the length will be about 825 <br />feet, and the crest width will be a minimum of 20 feet. This will require approxi- <br />mately 80,000 cubic yards of compacted ear*_h fill. • <br />The construction will consist of: <br />1. Stripping -Stripping of all construction areas of vegetation and debris. <br />Stockpiling vegetation and debris. Removing acid stockpiling all topsoil <br />_. _... - <br />on the construction areas. <br />2. Excavation - Excavation of the cutoff trench to consolidated-bedrock plus <br />four a_ dd_iti_onal feet of penetration. Tne excavated material wiII ~be stock- <br />piled. Any ecavated material that will meet the specificztioti-foi• ttie <br />impervious zone will later be used in that zone. <br />Note: All excavation where bearock is encountered will consist of removing <br />all debris, rock fragments, loose material, and water in such a manner as <br />to provide a clean surface iri preparation for backfilling. <br />3. <br />~r ' l <br />•~/4. <br />Backfillinq the cutoff trench will be done in accordance with section 5 <br />of the specifications. <br />The drainage filter will be placed to the lines and elevations shown on <br />the plans in the following manner: <br />a) Material - i) D15 of the filter ~ S to 40 <br />• D15 of the base material <br />Provided that the filter does not contain more than <br />5% of the material finer than 0.074 mm (No. 206 sieve). <br />i!) D15 of the filter - 5 or less <br />D85 of the base material <br />iii) The grain size of the filter should be roughly parallel <br />to that of the base material. <br />b) Moisture Control -The moisture content of the drainage filter prior to <br />and durirq compaction shall be distributed uniformly throughout each layer <br />of the material. The moisture content shall be sufficient to attain <br />the maximum relative density of the material in place, when compacted <br />by the specified compaction procedure as provided In subsection c). <br />~~ <br />-11- ..~ <br />.REVISED FEB 13 'R <br />
The URL can be used to link to this page
Your browser does not support the video tag.