My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2016 7:45:10 AM
Creation date
2/5/2009 11:11:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Doc Name
Dam Construction Certifications
Section_Exhibit Name
Appendix Q Section XVI
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - - DRAINAGE FII.TER <br />A drainage filter will be installed at the downstream toe of the embank- <br />- ment. The filter will be five feet in depth and ex-terd laterally in <br />each direction to elevation 6,300. A toe drain pipe will be placed in <br />the toe cut. The pipe vrill be six inch diameter plastic pipe with <br />1/4 inch pericratiens. The pipe will be separated at the principal spill- <br />vray at which point the end of each pipe will have a six inch diameter <br />drain pipe. The discharge pipes vrill exit near the principal spillway <br />outlet. The upper end of the drain pipes will be capped and discharge <br />• pipes will be accessible fcr inspection. <br />3. <br /> <br /> <br />.~ <br />- 4 - REVISED FEB 13'87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.