My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-03_REVISION - C1981014 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2009-02-03_REVISION - C1981014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:22 PM
Creation date
2/3/2009 2:56:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
REVISION
Doc Date
2/3/2009
Doc Name
Correction to Decision Form
From
DRMS
To
Energy Fuels Coal Inc
Type & Sequence
MR55
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : 2007 Midterm Review <br />Task description : Backfill and Regrade Pond L-1 <br />.. ............ :.:::.: ......... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,600 CCY factor : 1.125 volume : 2,925 LCY <br /> <br />Source of estimated volume: Map 26 <br />Source of estimated swell factor : CAT Handbook <br /> <br />.:, <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 80 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,460.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fid-rt) <br /> Push gradient : 1.00 (Cat HS) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,100 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SUN) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />.......... <br />JOB TIME AND COST <br />Adjusted unit production : 567.78 LCY/hr <br />Adjusted fleet production : 567.78 LCY/hr <br />Fleet size : 1 Dozer(s) Total job time : 5.15 Hours <br />Unit cost : $0.360 /LCY Total job cost : $1,054 <br />nig -55- 161ZD67
The URL can be used to link to this page
Your browser does not support the video tag.