My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-03_REVISION - C1981014 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2009-02-03_REVISION - C1981014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:22 PM
Creation date
2/3/2009 2:56:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
REVISION
Doc Date
2/3/2009
Doc Name
Correction to Decision Form
From
DRMS
To
Energy Fuels Coal Inc
Type & Sequence
MR55
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : 2007 Midterm Review <br />Task description :Backfill and Regrade Pond L-2 <br />.:. . <br />......... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source: (CRG) <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cost/hour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 600 CCY factor : 1.125 volume : 675 LCY <br />Source of estimated volume :Map 27 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 65 feet <br />Unadjusted hourly production : 1,752.8 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 6,100 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />-Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1day) <br />Spoil pile : 0.80 (fnd-rfl <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.39 <br />Adjusted unit production : 681.60 LCY/hr <br />Adjusted fleet production : 681.60 LCY/hr <br />Fleet size : 1 Dozer(s) Total job time : 0.99 Hours <br />Unit cost : $0.300 /LCY Total job cost : $203 <br />Mg-55- /b/?o 67
The URL can be used to link to this page
Your browser does not support the video tag.