My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (160)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (160)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:04 PM
Creation date
1/29/2009 4:07:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/17/2010
Doc Name
Exhibit 10 Item 6 Proposed Collom Project Baseline Vegetation Survey
Type & Sequence
PR3
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
manner, reclamation and resultant developing communities will be encouraged. to follow a more natural <br />path to maturation and` successional progression, as opposed to more historically utilized grassland <br />,conducive approaches that should only be utilized on the remaining 80%; of reclaimed ground (slopes). <br />It would be prudent when developing the reclamation plan, to include management and revegetation <br />specifications (shrub species in the seed mix) for use on the dominant "grassland" target areas that would <br />also facilitate shrub establishment when climatic conditions are favorable. In this manner,, small patches <br />of additional "inexpensive".shrubland can be established that will provide additional habitat diversity, <br />especially for sage grouse. However, since this type of reclamation is entirely dependent on the vagaries <br />of nature, we cannot depend on these techniques elsewhere. <br />Remaining Success Criteria and Monitoring <br />Based on past experience, it is not anticipated that there will be any significant difficulty in obtaining <br />sufficient ground cover, production, or diversity (assuming similar. success comparison approaches) for <br />bond release at Collom. The only possible exception may be for the PERA "20% areas" where significant <br />anti-grass techniques will be employed. For these areas, my suggestion would be to offer a 20% <br />reduction from reference area values as the target success criteria, or use the target "sage grouse" <br />reference area established during the Summer of 2005. <br />With regard to post-seeding monitoring, the current plan calls for monitoring during years 1, 2, 4, and 7 of <br />each seeded unit using managerial level efforts except for ground cover evaluations. This would appear <br />to be appropriate with the addition of the language that would add "every third year thereafter until Phase <br />III bond release" following year 7 monitoring. Furthermore, data generated by such monitoring should be <br />utilized once every five years (at permit renewal), to modify and update as necessary revegetation <br />protocols, success criteria, and bond release procedures as necessary. In addition, permanent plots <br />need to be established to hopefully document a "positive recruitment rate" for reclaimed shrub stands. <br />Weed Management <br />The revised Colorado regulations now incorporate by reference, Colorado's Weed Management Act. <br />Therefore, we need to develop a specific section of the reclamation plan to monitoring and control <br />procedures to be utilized during operations and reclamation. This activity is of special significance given <br />the existing baseline levels of several species of noxious weeds noted across the Collom permit area. It <br />may be reasonable to request input from the operators of Allen Weed Spraying (current weed <br />management contractor for Colowyo). <br />CCzHDAIR CCRZiEK Ass CI[Ams, INC. <br />Steven R. Viert <br />E <br />CIEUDAR IP3IEMKASWCHATMO, INC. Page 53 2005 Collom Vegetation Survey
The URL can be used to link to this page
Your browser does not support the video tag.