My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - C1981033
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981033
>
2008-12-04_PERMIT FILE - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:34 PM
Creation date
1/28/2009 10:43:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/4/2008
Section_Exhibit Name
EXHIBIT 04 PERMITS FOR MINING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FAX 242-7908 <br />• <br />C~ <br />MINE ENGINEERING <br />MINE RECLAMATION <br />August 4, 1993 <br />Colorado Department of <br />APCD-SS-B1 <br />4300 Cherry Creek Drive <br />Denver, CO 80222-1530 <br />Health <br />South <br />Re: Bear Coal Company, Inc. <br />Emissions Permit C-12,197 <br />Issued February 14, 1984 <br />Dear Sirs: <br />CIVIL ENGINEERING <br />CONSTRUCTION MANAGEMENT <br />On behalf of Bear Coal Company, Inc., enclosed is an Application <br />for an Air Pollution Emission Permit Modification. The permit <br />modification request will add a coal waste pile to the permit. <br />Bear Coal Company may need to periodically store coal waste <br />material on the surface. The coal waste material is generated from <br />roof falls in the underground mine. The waste material is hauled <br />to the surface and stockpiled with a front end loader. The coal <br />waste is then loaded into trucks and hauled to an approved gob <br />disposal area located at an area mine. The coal waste pile will <br />only be used intermittently as coal waste is generated in the mine. <br />The coal waste may be stored up to 30 days before it is hauled to <br />an approved disposal area. Up to 1500 tons may be stored in the <br />coal waste pile at any time. <br />If you have any questions, please give me a call. <br />Sincerely, <br />Jim Stover, P.E. <br />Consulting Engineer <br />Enclosures <br />cc: W. A. Bear <br /> <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.