Truck/Loader Team Work cont'd Task # : 026 sheet 2 of 2 <br />.. <br />Loading Tool Cvcle Time : Number of loading tool passes required to fill truck : 4 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load <br />NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dumE 0.625 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time aalustment : -v.vav minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.575 minutes <br /> Net load time per truck ' : 1.825 minutes <br />Truck Cycle Time : • bulk of 1st loader cycle completed during truck exchange if adj. loader cycle t ime < exchange time <br />Truck exchange time **: 0.70 minutes........ Adjusted for site altitude : 0.700 minutes <br />Truck load time: 1.825 minutes........ Adjusted for site altitude : 1.825 minutes <br />Truck maneuver and dump time: 1.10 minutes........ Adjusted for site altitude : 1.100 minutes <br />•' set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time : Road condition :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul rnnfa <br />Road <br />segment# Haul distance Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed Travel time' <br />(minutes) <br />1 700 11.00 5.00 16.00 526 1.345 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return rnufa • HBUI time *" : 1.345 minutes <br />minutes <br />minutes <br />~^ <br />Loading tool unit production : 935.64 LCY/hour...... Adjusted for job efficiency : 776.58 LCY/hour <br />Truck unit production : 452.25 LCY/hour...... Adjusted for job efficiency : 375.37 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader : 2 trucks <br /> Adjusted hourly truck team production : 750.74 LCY/hr <br /> Adjusted hourly single truck/loader team production : 750.74 LCY/hr <br /> Adjusted hourly multiple truck loader team production : 750.74 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 7.42 Hours <br />Unit cost : $1.415 /LCY Total job cost : $7,880 <br /> <br />~,i <br />` travel time shown for each segment includes acceleration/deceleration adjustment Return time""': O.Z54 <br />"'total haul and return time shown includes altitude adjustment Total truck cycle time : 5.224 <br />