My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-02_PERMIT FILE - C1996084A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996084
>
2008-09-02_PERMIT FILE - C1996084A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2018 7:14:47 AM
Creation date
1/28/2009 10:31:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
9/2/2008
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 026 State :Colorado PermiUjob # : C-96-084 <br />Date : 04/21/2008 County :Las Animas Abbreviation :none <br />User : JRS Site :Lorencito Canyon Mine Filename :C084-026 <br />Permit or other job action :Permit Renewal 02 <br />Task description :Replace Topsoil from Stockpile SSP#2 to Fi119a <br />HOURLY EQUIPMENT COST Shift basis : 1 perday <br />Truck/loader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />_\A/afar }n irk <br />t 773D (2002) <br />T 990 Series 11(2005) <br />t D9R - 9SU (2005) <br />t D9R - 9SU (2005) <br />T 14H <br />afar Tankar 5 000 GaL <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />Utilization-machine : 100 97 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $62.35 $62.35 $39.60 $21.89 <br />Operating cost/hour : $88.21 $112.87 $51.63 $103.27 $12.13 $8.68 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $162.42 $251.63 $146.77 $198.40 $76.20 $64.51 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals : Work : $576.47 Support : $345.17 Maintenance : $140.71 <br />Total work team cost/hour : $1,061.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,950 CCY factor : 1.125 volume : 5,569 LCY <br />Material weight <br />Descr.: Earth - dry packed <br />Rated payload <br />Payload capacity <br />2,550 pounds/LCY Struck volume : 33.80 LCY <br /> Heaped volume : 45.90 LCY <br />108,060 pounds Average volume : 39.85 LCY <br />42.38 LCY Adjusted volume': 42.38 LCY <br />Final truck volume based on number of loader passes : 39.38 LCY <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Caaacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.: Loose material - 1 "and over (85 - 90%) Altitude adj.: 1.000 1.000 (Cat HB <br />Bucket fill factor : 0.875 Job efficiency : 0.830 0.830 (1 shift/da <br />Adjusted bucket capacity : 9.843 LCY Net correction : 0.830 0.830 <br />~xh z3-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.