Laserfiche WebLink
Processing Waste <br /> Refuse Pile- 2/3/4 appeared to be well compacted and stable with a stockpiled of course refuse <br /> noted. Refuse Pile—5 appeared to be well compacted and stable and in the process of being <br /> stockpiled and graded at the time of the inspection. No problems were noted. <br /> Support Facilities <br /> Return Shaft 3 has been completed. The shaft was completed on 1116/09, the Friday before this <br /> partial inspection. The shaft was stable and functioning at the time of the inspection with no problems <br /> noted. The fence around the site was not installed at the time of the inspection, however the fence <br /> was on-site. Scott Wanstedt of BMI noted that the fence was scheduled to be installed the week of <br /> 1/26/09. No problems were noted with the site. <br /> RS-3 <br /> Overall, the Deserado Mine is in good condition and appears to be conducting operations as required. <br />