My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (21)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 12:29:54 PM
Creation date
1/28/2009 10:24:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
1/21/2009
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial coal inspection conducted by Jason Musick of the Colorado Division of <br /> Reclamation, Mining, and Safety(Division) on 21 January 2009. The weather was clear and the mine <br /> site was wet with snow cover throughout the mine site during the on-the-ground inspection. Scott <br /> Wanstedt of BME accompanied the inspection. <br /> The mine is currently operating as permitted. Return Shaft—3 was completed the Friday before the <br /> inspection 1/16/09. No drilling activities were in progress during the inspection. <br /> Roads <br /> The access road to the facilities area appeared to be well maintained with no problems noted. The <br /> haul road was wet; it appeared stable with no signs of erosion or damage. The conveyor corridor <br /> road, access roads and light-use roads were wet with patches of snow cover and appeared to be in <br /> good condition with no problems noted. All roadside ditches and diversions were snow covered at the <br /> time of the inspection. <br /> Hydrologic Balance <br /> The permanent pipe repair for the riser pipe at DP-1 is in progress with the installation of a walkway to <br /> the riser and trash guard still needing to be installed. DP-1 was snow covered at the time of the <br /> inspection. The pond embankment appeared stable with no problems noted. The newly repaired <br /> primary spillway and the secondary spillway appeared to be in compliance with no problems noted. No <br /> discharge was noted for PP-1 and PP-2. No problems were noted. <br /> �c <br /> F' <br /> If <br /> DP-1 Repaired riser pipe <br />
The URL can be used to link to this page
Your browser does not support the video tag.