Laserfiche WebLink
Alternatives Considered in Detail <br /> <br /> <br /> <br />Table 2-1 <br />Design Criteria <br />Topic Design Criteria for the Proposed Action <br /> 120. To the extent feasible, project workers would car pool to and from BMP <br /> the project area to minimize vehicle-related emissions and fugitive <br /> dust emissions. <br />RECREATION <br />Recreation 121. To avoid near-miss accidents between hunters and drillers, MCC CDOW <br /> will be encouraged to avoid operations on Mimiesota Creek Road suggestion <br /> from the Thursday before the second hunting season opener (mid- <br /> October) to the Wednesday after the second hunting season opener. <br /> If use is required for operations using over-sized vehicles during <br /> any period of public use, then MCC will use appropriate active <br /> traffic control measures. <br />CULTURAL RESOURCES <br />Cultural Surveys/ 122. Prior to the construction process, an intensive cultural resources 43 CFR 7 <br />Paleontological survey would be completed by the Proponent, at their expense, on Subtitle A <br />Resources all areas proposed for surface disturbance if it has not already been and 36 CFR <br /> inventoried per requirements of the Standard Notice for Lauds Part 296 <br /> Under Jurisdiction of the USDA attached to the leases. <br /> 123. During project implementation, in the event of an inadvertent 43 CFR 7 <br /> discovery of any other cultural resources not covered under and 36 CFR <br /> NAGPRA (above), work should cease and an archaeologist should Part 296 <br /> be notified to investigate the resource. Any cultural resources <br /> located will be brought to the immediate attention of the Forest <br /> Service and will be left intact until directed to proceed. All data and <br /> materials recovered will remain under the jurisdiction of the U.S. <br /> Government <br />CONSTRUCTION ACTIVITIES <br />Interim reclamation 124. Interim reclamation will be done through seeding of ungraveled BMP, State <br /> areas. <br /> 125. Stabilization of steep cut slopes that will remain unreclaimed over a BMP <br /> winter or longer will be stabilized through placement of native <br /> boulders or other reclamation. <br /> 126. Armor well pad fill slopes with excavated rock and/or slash BMP <br /> vegetation (brush, branches, and other slash vegetation) to reduce <br /> the velocity of rain drops and subsequent erosion. <br /> 127. All areas not necessary for the continued operation of the wells MCC Project <br /> would be reclaimed after drilling is complete. Plan, FS <br /> 128. All cut slopes would be aggressively re-vegetated (hydro-mulch BMP, State <br /> seeded and fertilized, if necessary) following the completion of <br /> construction to help stabilize these disturbed sites. <br /> 129. Post-construction seeding applications would continue until Forest Plan, <br /> determined successful by the Forest Service. CO DBMS <br />Deer Creek Ventilation Shaft and E Seam Methane Drainage Wells FEIS <br />39 <br />