Laserfiche WebLink
s <br />Table 2-1 <br />Design Criteria <br />Topic Design Criteria for the Proposed Action <br />Erosion & 111. Erosion will be minimized through interim reclamation including, BMP <br />Sediment Control but not limited to, contouring, seeding and mulching. <br /> 112. Sediment control measures such as, but not limited to, silt fence, BMP <br /> straw mulch, site containment and sediment control ponds will be <br /> utilized as needed. <br /> 113. Construction on steep slopes (>60%) would be fully designed and Forest Plan <br /> engineered according to Forest Service standards and design criteria <br /> and should include an erosion control and maintenance plan. <br />Geologic Hazard 1.14. Leases contain stipulations restricting surface occupancy in areas of Federal Coal <br /> geologic hazards: Avoid areas with high geologic hazards to Lease <br /> prevent mass slope failure in Section 32, T13S, R90W, 6th P.M. Stipulation <br /> unless specifically approved by authorized officer. <br /> 115. Controlled Surface Occupancy Stipulation. Areas with moderate Federal Coal <br /> geological hazards will require analysis and mitigation plans Lease <br /> detailing construction and mitigation techniques to ensure stability Stipulation <br /> of facilities in portions of Sections 27-29 and 32-34, T13S, R90W, <br /> 6th P.M. and Sections 3-4, 9-10, T14S, R90W, 6th P.M. unless <br /> specifically approved by authorized officer. <br /> 116. No Surface Occupancy Stipulation- No operating on slopes greater Federal Coal <br /> than or equal to 60% or areas surrounded by slopes greater than or Lease <br /> equal to 60% to prevent erosion, mass failure and loss of Stipulation <br /> productivity in portions of Sections 27-29 and 32-34, T13S, R90W, <br /> 6th P.M. and Sections 3-4, 9-10 T14S, R90W, 6th P.M. unless <br /> specifically approved by authorized officer. <br /> 117. Controlled Surface Use Stipulation Surface use on slopes 40-60% Federal Coal <br /> will be subject to analysis and mitigation plans detailing Lease <br /> construction and mitigation techniques to minimize potential for Stipulation <br /> soil loss, mass land movement, revegetation failure and <br /> unacceptable visual impairment except as otherwise approved by <br /> authorized officer. This may apply to lands in portions of Sections <br /> 27-29, 32-34 T13S, R90W, 6th P.M. and Sections 3-4, 9-10, T14S, <br /> R90W, 6th P.M. <br />Incidental Coal 118. Any coal recovered incidental to project will be taken back to the MCC Project <br />Recovery mine site or disposed of in the mud pits. Plan <br />AIR QUALITY <br />Surface Air Quality 119. Road watering and/or treatment with dust suppressant on the access BMP <br /> road during the short-term construction and development activities <br /> will minimize vehicle-related fugitive dust emissions. <br /> <br />• <br />• <br />38 Deer Creek Ventilation Shaft and E Seam Methane Drainage Wells FEIS <br />