Laserfiche WebLink
TABLE RP-1 <br /> ACTIVITY YD3 $/YD3 TOTAL <br /> Backfilling <br /> Portal Bench 17,000.00 <br /> Tractor .70 $ 11,900.00 <br /> FronC-end Loader .48* 8,160.00* <br /> $ 20,060.00* <br /> Access Roads 4,500.00 <br /> Tractor .35 $ 1,575.00 <br /> Front-end Loader .48* 2,160.00* <br /> $ 3,735.00* <br /> Sediment Ponds 1,000.00 <br /> Scraper 2.34* $ 2,340.00* <br /> Tractor .35 350.00 <br /> S 2,690.00* <br /> Truck Scale Area <br /> Tractor $ 400.00 <br /> 90.00 <br />• Grader 688.00* <br /> $ 1,178.00* <br /> Overburden Packing <br /> Tractor $ 555.00 <br /> Front-end Loader 280.00* <br /> S 835.00* <br /> SPGM Salvage (dam) 1,800.00 <br /> Tractor .35 $ 630.00 <br /> Scraper 2.34* 4,212.00* <br /> $ 4,842.00* <br /> SPGM Replacement (includes topsoil) 2,700.00 <br /> Scraper 2.34* S 6,318.00* <br /> Front-end Loader (see backfilling) - - - <br /> $ 6,318.00* <br /> Soil Preparation 33,066.00 <br /> Tractor .15* $ 5,092.00* <br /> Grader (see truck scale area) - _ _ <br /> $ 5,092.00* <br />• <br /> 114 ix (R ev. 8/30/85) <br />