Laserfiche WebLink
-. and mulching of the newly disturbed area to be performed soon after <br />• the regrading work is completed. <br />Minrec proposes to perform the repair work in mid to late September <br />with the regrading work competed no later than the end of September <br />1993. Seeding and mulching of the area will be done in late <br />September or early October. <br />STABILITY MONITORING <br />There are seven stability monitoring points which have been <br />surveyed quarterly since about 1985. The monuments are referred to <br />as S-1, S-2, S-3, S-5, S-6, S-7 and S-8. The face of the bench <br />slope has slumped three times since 1985, in 1988, 1989 and 1993. <br />After each of the slumps the stability monuments were surveyed and <br />no significant movement was noted. It is clear the stability <br />monuments are located on relatively stable portions of the mine <br />bench. No further monitoring of the stability monuments will occur <br />• unless there is visual evidence of instability on any portion of <br />the mine bench. If such visual instability is noted, monitoring of <br />the stability monuments will be re-initiated. <br />• 113ix Rev. 07-26-95 <br />