My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-03_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-10-03_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:50 PM
Creation date
1/27/2009 10:59:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/3/2008
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
infiltration. At the cuttings pit liner interface, quick-set grout will be injected above and below the liner to seal <br />the liner where it is penetrated by the surface casing. Cover material will be removed from a portion of the <br />cuttings pit, and borehole cuttings will be transferred to this area to dry, and will then be spread and compacted. <br />On completion of the borehole(s), the cover material will be replaced and stabilized by seeding with a <br />• temporary cover. The stockpiled cuttings will be used to backfill the MAC boreholes) during final <br />reclamation. A methane drainage pipeline and/or nitrogen injection pipeline will be installed within the cased <br />MAC borehole, and connected to one or more manifolded pipe systems underground which will connect to <br />sealed gob areas. At the surface, an 8-foot diameter culvert manhole may be installed around the cased MAC <br />boreholes) as a well-head, with appropriate grounding and lightning protection to meet MSHA requirements. <br />The fixed pipeline(s) will connect at the surface to a portable skid-mounted methane drainage pump and/or <br />skid-mounted nitrogen generator. Required power for this installation will be provided by dropline from the <br />existing powerpole, and the area will be fenced for security. Installation details are shown by the design <br />drawings in Exhibit 49Q. <br />6-North Mains Ventilation Shaft (TR05-48, MR06-208, MR06-210, MR06-212, MR07-218) <br />An additional intake ventilation shaft is necessary to maintain effective ventilation of active mining areas <br />in the northwest mining district and future west mining district. The new ventilation shaft will be located <br />in Section 17, TSN, R86W on a ridge northwest of the Northwest Mains Ventilation Shaft and fan, as <br />shown on Maps 23 and 23B. Site-specific investigations required for design and permitting of the new <br />ventilation shaft included a cultural resource survey of potential disturbance areas, soil and foundation <br />characterization as the basis for shaft pad and access road design, and completion of a wetland/AVF survey <br />for the shaft pad and access road. The cultural resource survey was conducted by Metcalf Archaeological <br />Consultants, the engineering soils characterization by Northwest Colorado Consultants, and the <br />soils/wetland/AVF survey by Habitat Management, as described in Section 2.04. Development, <br />construction, and installation of the intake ventilation shaft (Exhibit 49A, Figures EX49A-F 1 through F4 <br />. and Maps EX49A-M1 through M3, and Exhibits 49E and 49N) involve the following sequential activities: <br />• Completion of environmental and engineering investigations <br />• Placement of disturbed area markers <br />• Marking of wetland buffer zone <br />• Temporary drainage and sediment control measures <br />• Recovery and stockpiling of available topsoil <br />• Installation of drainage and sediment control structures <br />• Construction of an access road and site preparation for shaft pad <br />• Drilling and casing of seven (7) boreholes for: <br />- 3 power boreholes <br />- 1 water borehole <br />- 1 air compressor borehole <br />- 1 rockdust borehole <br />- lbulk-material drop borehole <br />• Construction of shaft collar structure and temporary drilling equipment pad <br />• Conventional blind sink excavation and casing operations <br />• Driving of additional entries to the south of the existing 6-North Main entries <br />• Installation of electrical sub-station and extension of power distribution line <br />• Fabrication ofMillion-Gallon Tank for mine water storage <br />• Installation of Rock-Dust Tank and Compressor <br />• Erection of escape hoist/elevator buildings and equipment and installation offence(s) <br />• • Installation and connection of escape hoist/elevator control equipment and systems <br />• Final clean-up and dressing of roads and site pads <br />These activities are briefly described in the following sections. <br />MR08-229 2.05 - 45.6a 08/01/0 <br />