Laserfiche WebLink
5) In Exhibit E, it is stated that the lake surface is proposed to be 48.92 acres. The Reclamation Map indicates <br />that the final reclaimed lake is proposed to be 18.8 acres. Please clarify the correct amount of proposed lake <br />surface acreage. <br />- The revised Map F submitted indlakeecreated inlfinal rec amation w 11 be 48.92 acreses. Please submit <br />a revised map that states that the <br />6) In Exhibit E, part 1. of the General Reclamation Plan indicates that 19.37 acres of wetlands are proposed. <br />This amount is different than the amounamou t of we ands to be onstructed lsof 38.71 acres of wetland. <br />Please specify what the correct proposed <br />- The revised Map F submitted indicates that the wetland shelf will be approximately 19.45 acres. <br />Please submit a revised map that states that the wetland shelf created in final reclamation will be <br />19.37 acres. <br />7) In Exhibit J, the last statement on page J-1, "See the letter from USACOE on the following page ". There is <br />not a letter on the following page. Please provide the referenced letter from the USACOE if it does actually <br />exist. <br />- Response adequate <br />8) In Exhibit L, Item No. 5, the wetland shelf is described as being 10.6 acres and on the final reclamation map <br />it is noted as being 38.71 acres. Please explain why the reclamation figure only accounts for 10.6 acres of <br />the total 38.71 acres. Please submit a reviled Wetland shelf. o account for the additional reclamation required <br />to complete the spreading of topsoil over t <br />- Response adequate <br />9) Per Rule 6.2.1, all maps must be prepared and signed by a registered land surveyor, professional engineer, <br />or other qualified person; date prepared must be shown. Please submit a Mine Plan map and Reclamation <br />Plan map that are signed and dated by the map maker. <br />Please provide a response to the listed issues a ann ~ ae pondbby January 26,12009 please subm00a writ n request <br />date of February 4, 2009 can be met. If you c p <br />to extend the decision date. If your response or a written extension request is not received by January 26, 2009 <br />the application may be denied. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and Safety, Grand <br />Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, telephone no. 970.241.2042. <br />Sincerely, <br />Travis Marshall <br />Environmental Protection Specialist <br />Cc: Steve Shuey, DRMS <br />