Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: X03 State :Colorado Permit/job# :X-2009-231-00 <br />Date : 0112612009 County :Routt Abbreviation :none <br />User: JDM Site : Sage Creek Filename :X--00-X03 <br />Agency or organization name : CDRMS <br />Permit or other job action : Sage Creek Project <br />Task description : Replace Topsoil from Stock pile to Drill Pads and Mud Pits <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 5.566 <br />Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilizatio n % <br />Ownership cost/hour : $30.42 NA <br />Operating cost/hour : $46.64 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $109.84 Total fleet cost/hour : $109.84 <br /> <br />LCY <br />Swell Loose <br />factor : NA volume <br />5,566 <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Average push distance : 50 feet <br />Unadjusted hourly production : 444.6 LCY/hr <br />Material consistency description <br />('nnonlirl?far! nf.a.Lnai. <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Loam <br />5.00 % (I <br />6,600 feet <br />2,100 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 1.10 <br />Blade type : 1.00 <br />Net correction : 0.49 <br /> <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time <br />Unit cost : $0.501 /LCY Total job cost : <br />LCY <br /> <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd-rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />219.03 LCY/hr <br />219.03 LCY/hr <br />25.41 Hours <br />$2,791