Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : X02 State : Colorado <br />Date : 0112612009 County : Routt <br />User: JDM Site : Saae Creek <br />Permit/job# :X-2009-231-00 <br />Abbreviation :none <br />Filename :X-00 X02 <br />Agency or organization name : CDRMS <br />Permit or other job action : Sage Creek Project <br />Task description :Regrade Drill Pads and Mud Pits <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 8.349 <br />Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 : BOPS Cab Shift basis:- 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cost/hour : $30.42 NA <br />Operating cost/hour : $46.64 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour:- --P2-78 NA <br />Total unit cost/hour : $109.84 Total fleet cost/hour : $109.84 <br /> <br />Swell Loose <br />LCY factor : NA volume : 8,349 LCY <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job <br />Average push distance : 50 feet <br />Unadjusted hourly production : 444.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (I <br />Average site altitude : 6,600 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description : <br />:ondition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1day) <br />Spoil pile: 0.80 (fnd-rt) <br />Push gradient : 0.90 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 1.10 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.49 <br />Earth - Loam Adjusted unit production : 219.03 LCY/hr <br />Adjusted fleet production : 219.03 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 38.12 Hours <br />Unit cost : $0.501 /LCY Total job cost : $4,187