Laserfiche WebLink
contoured to blend with the surrounding topography and seeded. To the extent <br />practical, these reclamation activities will be completed as part of the corresponding <br />construction activities. <br />E.5 Reclamation Schedule <br />The following reclamation schedule will commence upon approval of this permit <br />amendment. <br />Table E.5-1 Reclamation Schedule <br />Phase Description Time Required <br />Decommision Pond Commission Pond 4 as an interim water <br /> <br />1/Commission treatment pond, connect to West Pit wells via <br />2 weeks <br />Pond 4 temporary connection. Decommission Pond 1, <br /> remove liner and materials to landfill. <br />Prep Waste Rock B Strip topsoil and prepare surface to receive 1 week <br />Area excavated material <br /> Excavate and transport material to WR B Area, <br />West Pond foundation prep and install outlet piping, <br />Construction embankment construction with select materials, 10 weeks <br /> install HDPE lining. <br />Commission West <br />Pond / Treatment Connect West Pit wells to West Pond inflow. 1 week <br />Plant Offline <br />Decommission Remove WTP solids from Pond 3, remove liner 2 weeks <br />Ponds 2, 3 and 4 and materials to landfill <br /> Excavate east pond, with select excavated <br /> material used in berm construction. Excess <br />East Pond excavated materials stockpiled in West Pit. 7 weeks <br />Construction Install HDPE lining. Pit area adjacent to pond <br /> and reclaimed. Install new piping from West Pit <br /> wells and connect inflow piping. <br /> Excavate existing pipeline were necessary <br /> <br />Irrigation Pipeline <br />(trench), install necessary pipeline and fittings, Concurrent <br /> <br />Construction <br />pressure test approximately 5 intervals, backfill, with Pond <br /> <br />install connections. Construction <br />Battle Mountain Resources, Inc. 19 <br />P:\Pmjxts\212-Newmont(SenLws)\SsnLiis\Permit Amendment- Wet Pit M=g- AV5 Report @PDFs\Text\PetmitAmend=n v5-dw December 2007