Laserfiche WebLink
The reclamation plan for the collection pond remains unchanged from previous plans. <br />The reclamation cost has been updated to reflect current labor and equipment rates. <br />EA Areas Disturbed by Construction <br />The estimated limits of construction disturbance are shown on the Reclamation Plan <br />Maps (Section F). Construction disturbances have been grouped into three <br />categories; (1) disturbance of existing areas of disturbance that have not yet been <br />reclaimed, (2) redisturbance of existing areas of disturbance that have recently been <br />reclaimed, and (3) new disturbance of previously undisturbed areas. These areas of <br />construction disturbance consist o£ <br />1. The pond excavation areas within the West Pit (24 acres redisturbance of <br />recently reclaimed areas, no new disturbance) <br />2. The excavated material relocation area at the Waste Rock B stockpile (6.9 <br />acres redisturbance of recently reclaimed area, no new disturbance) <br />3. The irrigation pipeline (20.5 acres new disturbance), 9.1 acres within existing <br />BMRI permit area (new disturbance), 8.4 within pipeline corridor (primarily <br />redisturbance of previously reclaimed area), and 2.9 on ranch property outside <br />of irrigation circles (new disturbance) <br />4. The topsoil stockpile located along the TDA access road (approximately 1.5 <br />acres redisturbance) <br />5. The TDA spillway area (2.3 acres new disturbance). <br />The outslopes of the West Pit ponds and the Waste Rock B stockpile will be <br />contoured to match the existing reclaimed surface (3 to 1 [horizontal to vertical] or <br />flatter [see Exhibit G]), covered with a minimum of 12 inches of topsoil, and seeded <br />according to the seed mixture specified in the original permit. The pipeline corridor <br />will be reclaimed by backfilling the pipeline trench, contouring to blend with the <br />surrounding topography, and applying seed to the areas. Re-disturbance areas in the <br />topsoil stockpile will be contoured at 3 to 1 or flatter to blend with the surrounding <br />slopes and seeded. Areas disturbed by construction of the TDA spillway will be <br />Battle Mountain Resources, Inc. 18 <br />P:\Pmjects\212-Ne nt(SenLiris)\Sen =\Petmit Amendment - West Pit Management\V5 Report & PDFs\TertWermitAmeniIrnent-v5c.doc December 2007