Laserfiche WebLink
• Conclusion <br />Sedimentation Pond 014 does meet or exceed the design and performance requirements <br />of the CMLRB's regulations. Seneca will inspect the pond quarterly to evaluate structural <br />integrity, storage capacity conditions, and remedial work requirements in accordance with <br />the approved mine permit. Therefore, pursuant to Rule 4.05.6(10), the above is the <br />Sedimentation Pond 014 as-built certification report. <br />• <br />J <br />13-17-4 <br />