Laserfiche WebLink
POND DISCHARGE <br />The following table presents monitoring results for the mine seepage discharge. <br />Water was diverted to the new treatment pond during the week of June 14 to June 21, <br />1999. On August 2, 1999 the new treatment pond was full and discharging. <br />Bear performed lab analysis on the flow from the spring (hillside) as well as the pond <br />outflow during the year. Following are the data. <br />January 2008 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 2630 2481 <br />Total Suspended Solids mg/1) 30 13 <br />Iron (mg/1) 2.15 3.28 <br />Februa 2008 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 2844 2952 <br />Total Suspended Solids (mg/1) 10 12 <br />Iron (Mg/1) 1.98 2.6 <br />March 2008 <br /> Pond Hillside <br /> March 3` - 18 <br />Total Dissolved Solids (mg/1) 3155 - 2270 3764- 2800 <br />Total Suspended Solids (m g/0 15-11 18 - 10 <br />Iron (mg/1) 2.31 -1.45 3.91-1.52 <br />April 2 008 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 2890 3428 <br />Total Suspended Solids (mg/1) 14 10 <br />Iron (mg/1) 1.26 2.43 <br />May 2008 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 2943 3095 <br />Total Suspended Solids (mg/) 9.5 60 <br />Iron m /I 1.33 6.04 <br />June 2008 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 4303 3814 <br />Total Suspended Solids (mg/) 15 21 <br />-5-