Laserfiche WebLink
<br />The applicant will commit to mitigation measures should- the groundwater level <br />'drop one meter below,the averaged background measurements. Should mitigation <br />measures be necessary, the Applicant will apply-water as necessary to the area of <br />concern. <br />Rule 6.4.7 Exhibit G - Water Information <br />3. The most recent field survey of the area of exposed groundwater is 23.79 acres.' <br />The limit of the existing permitted augmentation plan is 28.49 acres. <br />As indicated on the attached Phase Map, the total maximum acreage of exposed <br />groundwater is anticipated to be 39: 10 acres. This represents a potential of 10.61 <br />acres of additional exposed groundwater. This additional water requirement, is the <br />basis for the supply plan under review. The Applicant will not exceed the current <br />limits of exposed groundwater pursuant to the augmentation plan. Your office will <br />be notified once the additional water supply plan is accepted and implemented. <br />Please contact me with any comments or questions you may have. , <br />Happy H idays, <br />Matt Ca ahan, Resource Specialist <br />Southwest Land Services, Agent for Four Corners Materials <br />Encl: WWE Phase Map <br />Xc: P. Kearl, FCM, w/out encl.