My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-02_INSPECTION - M1977344
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977344
>
2009-01-02_INSPECTION - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:23 PM
Creation date
1/6/2009 3:19:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
INSPECTION
Doc Date
1/2/2009
Doc Name
Detailed Facilities Inventory
From
Holcim
To
DRMS
Inspection Date
12/19/2007
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br />25 <br />54 <br />53 24 <br />7E <br />55 <br />56 11 33 <br />14C 9A <br />14A 1 32 148 22 49 <br />15 21 8 51 39 20 44 57 51 <br />1 9 <br />37 42 <br />50 & 19 98 31 30 10 <br />36 2 <br />9C 35 17 <br />46 16 13 <br />190 50 <br />47 <br />34 <br />45 <br />48 <br />BUILDING STRUCTURES BUILDING STRUCTUi+ES <br />1 PLANT WAREHOUSE & MAINTENANCE 28 CRUSHER ELECTRIC <br />2 SERVICE BUILDING 29 CRUSHER COMPRESSOR <br />3 1974 MILL COMPLEX, AIR SEPERATOR 30 PREBLEND SHELTER 4 1974 MILL COMPLEX, FINISH MILL AREA 31 RAW MATERIAL ANALYZER & ELECTRIC <br />5 1974 MILL COMPLEX, OLD COMP. ROOM & CONTROL ROOM 32 RAW MILL ELECTRIC, COMPRESSOR & ELECTRIC 6 1974 MILL COMPLEX, COOLER, NEW OFFICE AREA 33 RAW MILL FEED / BLENDED MATERIAL ANALYZER <br />7 CONTOL ROOM & PUMP HOUSE 34 MAIN ELECTRICAL CONTRC'_ 8 SO. QUARRY GARAGE 35 BAGHOUSE BYPASS CONTROL <br />9 NO. QUARRY GARAGE 36 PREHEATER ELECTRICAL CONTROL ROOM 9A LUBRICATION OIL SHED 37 KILN GEAR ELECTRICAL & TRANSFORMER ROOM <br />9B FUEL SHELTER 38 COOLER PUMP SHED <br />9C TRUCK WASH 39 CLINKER COOLER BAGHOUSE ELECTRICAL ROOM 10 QUARRY AREA ELECTRIC SUBSTATION 40 CLINKER SILO ELECTRICAL & TRANSFORMER ROOM <br />11 SERVICE BUILDING & WAREHOUSE 41 COAL MILL HYDRAULIC SHELTER 12 UTILITY STORAGE BUILDING 42 COAL MILL ELECTRIC <br />13 ADMINISTRATION OFFICE 43 WATER FILTRATION PLANT 14A NORTH CLINKER SILO 44 RAW MILL FEED BINS <br />14B SOUTH CLINKER SILO 45 AIR / OIL HOUSE BLDG 14C REJECT CLINKER SILO 46 SCRUBBER 28 <br />15 CLINKER DOME 47 RAW MEAL SILO 16 CEMENT GRINDING ENCLOSURE 48 RAW MILL <br />29 17 XFOBS 16 RAW MATERIAL SILO 49 CLINKER COOLER BLDG <br />18 NEW CEMENT SILO 50 OLD PRIMARY CRUSHER 19 CEMENT SILO ELECTRIC 51 OLD SECONDARY CRUSHER <br />20 GROUP 3 PLAT BLDG 52 COAL SILO 21 GROUP 2 1965 SILOS 53 PLANT 2 KILN BUILDING <br />22 PACKHOUSE SILOS 54 PLANT 2 MILL BUILDING 23 RAW WATER PUMP HOUSE 55 TRUCK WEIGH SCALE <br />24 COAL HANKLING CONTROL ROOM 56 RAW WATER TANK H 25 RR MAINTENANCE BUILDING 57 OLD OLD PRIMARY CRUSHER H o I c i m DF' ' <br />26 COAL UNLOADING CONTROL ROOM A, ynr ~.4L wis WrArm "AKR 122 M"cl Whom <br />27 QUONSET HUT MISC. STORAGE ~n na w- :+rt r. c as z n PORTLAND PLANT PORTLAND PLANT - FLORENCE COLORADO <br />
The URL can be used to link to this page
Your browser does not support the video tag.