Laserfiche WebLink
Section 16.0 <br />Facility Drainage [112.8 (b)] <br />Areas of the facility with reasonable potential for petroleum spills include <br />the following areas: <br />¦ Vehicle <br />¦ Bulk loading and unloading area <br />¦ Secondary containment area with AST's <br />¦ Emergency generator diesel fuel AST <br />16.1 Diked Area Drainage [I 12.8(b) (1)] <br />Diked storage areas are identified on the site map Appendix B <br />16.2 Diked Area Drainage Valves [112.8 (b) (2)] <br />After visual observation for contamination, facility personnel will drain that <br />precipitation from the containment areas. This will be done via pumps and <br />hoses to the ground adjacent to the area allowing free flowing to the <br />discharge point. The free flowing will occur if the precipitation does not <br />evaporate or infiltrate the soil. <br />16.3 Undiked Area Drainage [112.8(b) (3)] <br />At this facility any drainage will consist of sheet flow to the stormwater <br />discharge point.