Laserfiche WebLink
CU M1 <br />Applegate <br />:.: Groupond. R??IVD <br />-? -" -t/JUN1- <br />6 ?05 <br />June '15, 2005 <br />Division of Minerals and Geology <br />Mr. Carl Mount <br />hop <br />Senior Environmental Protection Specialist <br />Division of Minerals and Geology". ,/s? ._. a I <br />1313 Sherman Street, Room 215 v <br />Denver, Colorado 80203 <br />f c-? <br />e <br />f <br />. <br />,. <br />S <br />Ho <br />VA <br />RE <br />r <br />R <br />u <br />I <br />: <br />c <br />eage Release <br />eguest;_Jake Ka <br />ffman & Son, <br />nc.; . <br />Wagner/Kauffman Pit #3; M-99-069 ? <br /> <br />Dear Mr. Mount: . <br />The following information: is being submitted on behalf of our client, Jake. Kauffirlan & Son, Inc. <br />The Wagner/Kauff nan Pit #3 mining operation (M-99-069) is located mainly in the Northwest %4 <br />of the Northwest 1/4 of Sectio12 1, Township 5 North, Range 68• West, of the 6t' P.M.' The site is <br />located in Larimer County approximately 1.5 miles east.of Loveland, Colorado. <br />Phase I of the mining operation covers the east half of the permit area, with approximately 66, <br />total acres being mined. Mining in Phase I is essentially complete. Reclamation activities have <br />been concurrent with mining and approximately 47 acres of Phase I. have been backfilled and <br />revegetated consistent with Exhibit E, Reclamation Plan, of the Reclamation Permit Application. <br />Jake Kauffman & Son, Inc. is requesting release of the permit area for the reclamation activities <br />completed. A reduction in the permit financial warranty is NOT being requested., The affected <br />area has been backfilled, graded, and revegetated consistent with Exhibit E of the Reclamation <br />Permit Application. All backfilling and grading activities on the 47-acre portion of the site were <br />done as mining . progressed. Final grading was finished. in 2003 after mining operations were <br />completed and revegetation of the site was performed in Fail 2003 and Spring 2004. The owner <br />chose, to seed the affected area with pasture grasses consistent with the final land use, and the <br />vegetative cover is presently doing well. <br />In compliance with Subsections 3.1.1 through 3.1.4 of Section 3.1, Reclamation Performance <br />Standards, Construction Material Rules and Regulations, a post-mining land use was established <br />for the site, approved by the Office, and a reclamation plan was formulated. As stated in <br />Exhibit E of the Reclamation Permit Application, the final reclamation plan for this portion of <br />the site was to return the disturbed ground to.pastureland and to match the reclaimed grade of the <br />property to the pre-existing grade. Consistent with Exhibit E, backfilling of :the mined pit and <br />grading activties,were concurrent with mining operations. <br />1499.West 120th Avenue, suite 200 (303) 452-6611 • Fax (303) 452-2759 <br />Denver, Colorado 80234-2759. www.applegategr6up.com <br />