Laserfiche WebLink
Pond 10 <br />As-Built Report <br />TABLE OF CONTENTS <br /> P_a~e <br />Introduction 13-3A.1 <br />Embankment and Excavation 13-3A.2 <br />Design Analysis 13-3A.2 <br />SEDCAD Demonstration 13-3A.2 <br />Storage Capacity 13-3A.4 <br />Spillways 13-3A.4 <br />Summary 13-3A.5 <br />Construction Summary 13-3A.5 <br />Conclusion 13-3A.6 <br />LIST OF ADDENDUM <br /> Addendum 13-3A-1 - Isolinea of R Factor for Western U.S. <br /> Addendum 13-3A-A - 10-Year, 24-Hour SEDCAD Demonstration <br /> Addendum 13-3A-B - 25-Year, 29-Hour SEDCAD Demonstration <br /> Addendum 13-3A-C - 100-Year, 24-Hour SEDCAD Demonstration <br /> Addendum 13-3A-D - Emergency Spillway Outflow Channel <br /> Addendum 13-3A-E - Pond 010 Final Geotechnical Report and Summary <br /> <br />TR-30 13-3A.i Revised 05/07 <br />