Laserfiche WebLink
<br />• <br />North of mining area <br />East of mining area <br />East of mining area <br />West of mining area <br />Sedimentation Pond 010 <br />Sedimentation Pond 011 <br />Sedimentation Pond 011A <br />Sedimentation Pond 012 <br />Sedimentation Pond 013 <br />Sedimentation Pond 014 <br />Sedimentation Pond 012A <br />Attachment 13-3 <br />Pond Name <br />Pond Location Design Report Location <br />West of mining area <br />Southwest of mining area <br />West of mining area <br />Attachment 13-4 <br />Attachment 13-12 & 13-18 <br />Attachment 13-12 <br />Attachment 13-12 <br />Attachment 13-12 <br />Attachment 13-12 & 13-21 <br />As-built reports for the sediment ponds are located in the PAP as follows: <br />Pond Name <br />Design Report Location <br />Sedimentation Pond 010 Attachment 13-3A <br />Sedimentation Pond 011 Attachment 13-4A <br />Sedimentation Pond 011A Attachment 13-19 <br />Sedimentation Pond 012 Attachment 13-12A <br />Sedimentation Pond 013 Attachment 13-20 <br />Sedimentation Pond 014 Attachment 13-17 <br />t <br />Discharge Structures <br />Discharge from sedimentation ponds, diversions and pit dewatering will be controlled by energy dissipators, <br />riprap channels, and other means or devices, where necessary, to reduce erosion, to prevent deepening or <br />enlargement of stream channels, and to minimize disturbance of the hydrologic balance. Discharge <br />structures will be designed according to standard engineering design procedures. <br />Transportation Facilities <br />Haulage Roads. The following describes the design and construction of the existing haul roads at the Yoast <br />Mine. The locations of existing haul roads are shown on Exhibits 12-1, Operations Plan, and 13-1, Facilities <br />Map. Geotechnical and geological investigations were completed for these roads and can be found in <br />Attachments 13-5, Geotechnical Investigation Haul Roads Y-A and Y-B, and Pond 010, and 13-6, <br />Geological Report for Haul Roads A and B. Proposed haulroads will be constructed using the <br />recommendations included in these reports <br />General Requirements. SCC will construct, maintain and reclaim haul roads to minimize erosion and <br />siltation, air and water pollution and damage to public and private property. To the extent possible, using <br />the best technology currently available, haul roads will not cause damage to fish, wildlife, or related <br />environmental values and will not cause additional contributions of suspended solids to streamflow or to <br />runoff outside the permit area. Any such contribution shall not be in excess of limitations of State or <br />Federal law. <br />TR-37 11 Revised 02/08 <br />