My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - C1994082A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1994082
>
2008-12-04_PERMIT FILE - C1994082A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 7:29:11 AM
Creation date
12/29/2008 3:00:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
12/4/2008
Section_Exhibit Name
Tab 01 Permit Summary
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~;-; <br /><-,~~~ „ <br />.~i~"".y, r~ <br />• • Technical Revision~TR•08,~ was submitted on December 17, 1997 and presented the as-built <br />and certification for Pond 011 and updated the NPDES and water rights information. The <br />proposed decision to approve was issued on January 2, 1998. <br />• Technical Revision (TR-09~, was submitted on February 9, 1998 and provided the as-built and <br />certifications for Haul Roads A and B. The proposed decision to approve was issued on May 11, <br />1998. <br />• Technical Revision (TR-10~ was submitted on August 3, 1998 and addressed an increase in <br />reclamation bond resulting from the Midterm review. The proposed decision to approve was <br />issued on October 5, 1999. <br />• Permit Revision (PR-01.~ was submitted on March 1, 1999 and provided updated, detailed life- <br />of-mine plans for the mining, reclamation, and related operations for the Yoast Mine past the <br />original five-year permit term. The proposed decision to approve was issued on October 15, <br />1999. <br />• Technical Revision ~I'R-11~ was submitted May 27, 1999 and addressed preliminary <br /> development activities at the Yoast South Area. The proposed decision to approve was issued <br /> on July 1, 1999. <br />• Permit Renewal AQplication (RN-01) was submitted on January 28, 2000 for a successive five- <br /> year permit term. The proposed decision to approve the permit renewal application was issued <br /> on March 6, 2001. <br />• Technical Revision ~TR-12a was submitted on March 22, 2000 and provided the as-built and <br /> certification for Pond 012. The proposed decision to approve was issued on May 3, 2000. <br />• Technical Revision~TR-]3~ was submitted on March 27, 2000 and presented an incidental <br /> increase to the disturbed area. The proposed decision to approve was issued on May 16, 2000. <br />• • Technical Revision~jTR-1~ was submitted on April 27, 2000 and provided a stability analysis <br /> for Pond 014 embankment. The proposed decision to approve was issued on July 5, 2000. <br />• Technical Revision QTR-15~ was submitted on January 11, 2001 and updated the mine plan to <br /> utilize auger mining methods in final highwalI azeas. The proposed decision to approve was <br /> issued on February 15, 2001. <br />• Technical Revision (TR-16~ was submitted on June 20, 2001 and updated changes to the <br /> hydrologic monitoring program. The proposed derision to approve was issued on July 30, 2001. <br />• Technical Revision (TR-17~. was submitted on June 28, 2001 and provided an as-built <br /> certification for a portion of Haul Road D. The proposed decision to approve was issued on <br /> July 30, 2001. <br />• Technical Revision (TR-18~ was submitted on June 28, 2001 and presented a remedial plan <br /> and slope stability analysis for the landslide above Pond 012. The proposed decision to approve <br /> was issued on October 3, 2001. <br />• Technical Revision (TR-19~ was submitted on November 16, 2001 and provided the as-built <br /> and certification for Pond 014. The proposed decision to approve was issued on January 14, <br /> 2002. <br />• Technical Revision (-TR-20~ was submitted on December 10, 2001 and addressed changes to <br /> the reclamation schedule for the north mining area. The proposed decision to approve was <br /> issued on March 7, 2002. <br />• Technical Revision ( R_21~ was submitted on July 15, 2002 and incorporated highwall mining <br /> into the mine plan. The proposed decision to approve was issued on September 30, 2002. <br />• Technical Revision (TR-221 was submitted on December 5, 2002 and presented changes to <br /> the hydrologic monitoring program and revised the timing of surface disturbance. The proposed <br /> decision to approve was issued on January 6, 2003. <br />® Technical Revision (TR-23~ was submitted on July 25, 2003 and provided for an increase in <br />• disturbance area. The proposed decision to approve was issued on September 9, 2003 <br />PR -02 3 Revised 10/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.