Laserfiche WebLink
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action :RN5 <br />Task description :Regrade cut/fill slopes forA-1 haulroad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 2 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $95.90 NA <br />Operating cost/hour : $224.59 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $32.93 NA <br />Total unit cost/hour : $353.42 Total fleet cost/hour : $706.84 <br /> <br />MATERIAL QUANTITIES X: xx <br />Initial Swell Loose <br />volume : 349,955 CCY factor : 1.090 volume : 381,451 LCY <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient : 3.00 % (i <br />Average site altitude : 6,500 feet <br />Material weight : 2,600 Ibs/LCY <br />Weight description : <br />Clay and gravel - Wet <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.81 (2 shifts/day) <br />Spoil pile : 0.80 (fnd-ro <br />Push gradient : 0.95 (Cat HB) <br />Altitude : 1.00 _ (Cat HB) <br />Material weight : 0.88 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.37 <br />Adjusted unit production : 1595.88 LCY/hr <br />Adjusted fleet production : 3,191.77 LCY/hr <br />Total job time : 119.51 Hours <br /> <br />Unit cost : $0.221 /LCY Total job cost : $84,475