My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:16 PM
Creation date
12/24/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/11/2007
Doc Name
Adequacy Concerns
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade cutffill slopes for East A pit Hau/road <br />.. . <br />.: <br />HOURLY EQUIPMENT COST " "'` <br />Basic machine : Cat D11 R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 2 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />% <br />Cost Break <br />down : <br />Ownership cost/hour : <br />$95.90 <br /> Operating cost/hour : " <br />$224.59 <br /> Ripper op. cost/hour $0.00 <br /> Operator cost/hour : $32.93 <br /> <br />..... Total unit cost/hour : $353.42 Tota l fleet cost/hour : $353.42 <br />. <br />.:.... <br />MATERIAL QUANTITIES <br />- "` <br />Initial Swell <br />Loose <br />volume : 56,444 CCY factor : 1.090 volume : 61,524 LCY <br />Source of estimated volume: Fig. 3.7-1 <br />Source of estimated swell factor : cat <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> <br />Avera <br />h <br />i Operator skill : 0.75 (avg.) <br />ge pus <br />d <br />stance : <br />7 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 4,351.4 LCY/hr Dozing method : 1.00 <br />(gen.) <br /> <br />Material consistency description : Visibility: 1.00 (avg.) <br /> <br />Compacted rill or embankment Job efficiency : 0.81 (2 shifts/day) <br /> Spoil pile : 0 <br />80 f <br /> . ( <br />nd-ro <br /> <br />Average push gradient : <br />3.00 % (pos) Push gradient : 0.95 (Cat HB) <br /> <br />Av <br />it <br />l Altitude : 1.00 (Cat HB) <br />erage s <br />e a <br />titude : 6,500 feet Material weight : 0.88 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,600 Ibs/LCY Net correction : 0.37 <br />Weight description : <br />Clay and gravel - Wet Adjusted unit production : 1595 <br />88 LCY/ <br /> . hr <br /> Adjusted fleet production : 1,595.88 LCY/hr <br /> <br />JOB TIME AND COST .< <br />Fleet size : 1 Dozer(s) Total job time : 38.55 Hours <br />Unit cost : $0.221 /LCY Total job cost : $13,625 <br />
The URL can be used to link to this page
Your browser does not support the video tag.