Laserfiche WebLink
EXHIBIT G <br />WATER INFORMATION <br />(1) This operation is not expected to directly affect surface or groundwater systems. <br />(2) Not applicable <br />(3) No water will be used in this operation <br />(4) Not applicable <br />(5) No water or storm water will be discharged from the site. The topography of the <br />site will retain all water within permit boundaries. It is our understanding that under <br />these conditions no NPDES permit is required.