My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-22_PERMIT FILE - M2008085
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008085
>
2008-12-22_PERMIT FILE - M2008085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:10 PM
Creation date
12/22/2008 3:04:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008085
IBM Index Class Name
PERMIT FILE
Doc Date
12/22/2008
Doc Name
New 112c application
From
Asphalt Constructors, Inc.
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arkn <br />7040 M Hwy. 180 AlaMOS& CM 81181 (739) 5898671 <br />The names of the grasses and the seed rates for Phase II are listed here: <br />SPECIES <br />Western Wheatgrass <br />Wyoming Big Sagebrush <br />Needle and Thread <br />Indian Ricegrass <br />Blue Grama <br />Bottle Brush Squirreltail <br />RATE (PLS/AC) <br />3.0 <br />0.5 <br />2.25 <br />1.0 <br />1.0 <br />3.0 <br />It will take one to two days to plant the seed. The best time to plant will be either in the <br />spring from about April 1 to June 30 or in the fall from August 1 to October 31. <br />f.iii. No fertilizer required per Natural Resource Conservation Service. <br />f.iv. No trees, shrubs or other types of vegetation will be planted other than what is to be <br />seeded. <br />f.v. Topsoil will be replaced at a minimum of three (3) inches.
The URL can be used to link to this page
Your browser does not support the video tag.