Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $51.68 1 $51.68 $51.68 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $51.68 $51.68 <br />.. ................ . <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) = 0.33 <br />Return time (hours) = 0.33 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.67 <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Equipment <br />0.33 Total non-roadable mob/demob cost <br />0.33 * two round trips with haul rig <br />NA Total roadable mob/demob cost ** <br />NA .. one round trip, no haul rig <br />0.67 <br />Granby <br />15.0 miles <br />45.0 mph <br />$901.24 <br />$34.45 <br />JOB TIME AND COST Total job time : 3.33 hours <br />Total job cost : $936