Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name: DRMS <br />Task # : 05a State :Colorado Permit/job #:M-1998-034 <br />Date : 0610212008 <br />User : THM <br />County :Grand <br />Site :Parshall Pit <br />Abbreviation :none <br />Filename :M034-05a <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Initial mobilization to and from site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour. $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />..w.. ?? w r? w rig ? c/1111?MGdIT <br />Machine ^r <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series ll - 8SU (20 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-Revegetation tractor 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $284.44 $214.12 $0.00