My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-03_REVISION - M1998034
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998034
>
2008-06-03_REVISION - M1998034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:18 PM
Creation date
12/22/2008 1:14:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998034
IBM Index Class Name
REVISION
Doc Date
6/3/2008
Doc Name
TR approval
From
DRMS
To
Applegate Group, Inc.
Type & Sequence
TR1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 02-Jun-2008 Permit or job no. M-1998-034 Site : Parshall Pit <br />User : THM Abbreviation : none State : Colorado <br />Filename <br />M034-000 <br />Agency or organization name: DRMS <br />Permit or job action : Final Reclamation Cost Update <br />TASK L IST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />01a -Rip 5 acres of pit floor ripper 1 7.33 $1,276 <br />02a -Spred topsoil over 7.25 acres dozer 1 43.50 $7,295 <br />03a -Removal of Water clarification system demolish 1 16.00 $11,264 <br />04a -Revegetate 7.25 acres revege 1 16.00 $16,532 <br />05a -Mobilization to and from site mobilize 1 3.33 $936 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 86.16 $37,303 <br />" includes inflation factor adjustment of : NA % TOTAL DIRECT COST * = $37,303 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $754 <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA" NA NA total = <br />Profit : 10.00 % of direct total = <br />T109 <br />IVA <br />a,3, r.sv <br />. not required (or eqp. operator serves as super.) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />. contingencies accounted for at task level <br /> TOTAL O & P = $4,876 <br /> CONTRACT AMOUNT (direct + O & P) = $42,179 <br />500.00 total $ NA total = $500 <br />NA NA NA total = NA <br />5.00 % of cntr. NA total = $2,109 <br />NA* NA total = NA <br /> TOTAL INDIRECT COST = $7,484 <br />TOTAL BOND AMOUNT (direct + indirect) _ $44,787 <br /> <br />County : Grand
The URL can be used to link to this page
Your browser does not support the video tag.