My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-19_REVISION - M1980244 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-12-19_REVISION - M1980244 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:08 PM
Creation date
12/22/2008 8:38:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/19/2008
Doc Name
Cost Model
From
CC&V
To
DRMS
Type & Sequence
TR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 0 <br />Reclamation Warranty Required by Year if only VLF Phase 5 Phased <br />2008 2009 2010 2011 2012 2013 <br />$81,294,665 $81,294,665 $81,294,665 $98,994,665 $98,994,665 $98,994,665 <br />Incremental Increase by Year $0 $0 $17,700,000 $0 $0 <br />Phase 5 deferred bond. <br />1 Chemical Closure <br />410 million tons <br />$28.7 million <br />2 VLF Reclamation <br />500 acres total VLF <br />$28.7 million <br />X = $7.7 million deferred <br />110 million tons <br />x x <br />138 acres (Phase 5) <br />x X <br />X = $7.9 million deferred <br />($17,700,000 deferred until 2011) <br />2014 <br />$98,994,665 <br />$0 <br />3 DRMS Overhead <br />$34.6m total labor and equipment for VLF x 0.235 indirect add-on x 0.26 (% of Phase 5) _ $2.1 million indirect costs deferred <br />Total Phase 5 Deferral = $17,700,000
The URL can be used to link to this page
Your browser does not support the video tag.