My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-19_REVISION - M1980244 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-12-19_REVISION - M1980244 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:08 PM
Creation date
12/22/2008 8:38:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/19/2008
Doc Name
Cost Model
From
CC&V
To
DRMS
Type & Sequence
TR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Carlton Tunnel Water Monitoring and Site Maintenance <br />What is the estimated frequency of monitoring per year? <br />How many samplers will be required each collection event? <br />How many hours for each person per sampling event? <br />How many days per year will travel expenses apply to? <br />What is the hourly cost for a technician to collect samples? <br />What is the cost for use of a pick-up truck per hour? <br />How many surface water collection points will be monitored? <br />How many surface samples will be collected in a year? <br />How many wells will be monitored? <br />How many well samples will be collected in a year? <br />'What is cost/trip for a pump to collect well water samples? <br />What is cost/trip for a suppies to collect water samples? <br />What is the inflation factor based on CPI? <br />How many years will the monitoring program be needed? <br />Carlton Tunnel Care and Maintenance <br />Quantity Calculation <br />12 <br />1 <br />3 36 <br />4.5 <br />$ 100.00 <br />$ 13.65 <br />1 <br />12 12 <br />0 <br />0 0 <br />$ 20 <br />1.069518717 <br />5 <br />Equipment <br />Cost <br />Units (per ear <br />hours <br />$ 246 <br />surf samples <br />well samples <br />• <br />Labor Mat'ls/Supplies Total <br />Cost & Expjnses Cost ' <br />(per ear er' ear (per ear <br />$ 3,600 $ 3,600 <br />$ 385 $ 385 ; <br />$ 246 <br />$ 4,797 $ 4,797 <br />$ 240 $ 240 <br />Pond and Ditch Maintenance $ 5,000 $ 5,000 <br />Miscellaneous Site Maintenance $ 2,500 $ 2,500 <br />Subtotals = $ 246 $ 11,100 $ 5,422 $ 16,768 <br /> Total Carlton Tunnel Monitoring and Maint.= $ 1,228 $ 55,500 $ 27,112 $ 837840 <br /> <br /> <br />From Above pro-rated by typical GW and SW Fractions 0 otal Cost Heap Effluent Monitoring = $ 9,480 $ 44,867 $ 68,699 $ 123,045 <br /> check = $ 469,295 <br />Grand Total Cost of Monitoring Efforts = $ 30,341 $ 216,367 $ 222,588 $ 469.29511 <br />MDE (3-3-08). Rev (4-2-08) <br />Rev (11-4-08)
The URL can be used to link to this page
Your browser does not support the video tag.