_INSPECTION - C1981019 (27)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:12:40 PM
Creation date
12/19/2008 8:28:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
12/9/2008
Email Name
JRS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br /> 9 December 2008 �- <br /> Pg 3/4 <br /> Hydrologic Balance (cont.): - Sump 1 was not inspected. <br /> - Sump 2 contained water approximately 18 inches below the top and was not <br /> discharging at the time of the inspection. The sump was stable at the time of the <br /> inspection. <br /> - Sump 3 contained water approximately two feet below the top and was not <br /> discharging at the time of the inspection. The sump was stable at the time of the <br /> inspection. <br /> - Sump 4 contained water approximately three feet below the top of the sump and <br /> was not discharging at the time of the inspection. The sump was stable at the time of <br /> the inspection. <br /> - Sump 5 contained water to the top of the sump but was not discharging at the time <br /> of the inspection. The sump appeared to be stable at the time of the inspection. <br /> Water from this sump was backing up and creating a wet/muddy spot along the <br /> Taylor Creek road. <br /> Backfilling and Grading: - Colowyo has committed to provide two reclamation <br /> schedules for the East Pit closure. The first plan is a short term plan that will <br /> encompass the area around the Prospect ditch, including the sump area that is part <br /> of the ditch which is not yet to final grade. This short term plan, in the form of a <br /> Technical Revision, is due to the Division no later than 24 December 2008. The <br /> second plan is a long term plan that will provide a comprehensive reclamation <br /> schedule for the remaining East Pit, including the closure of the final pit. This long <br /> term plan is due to the Division in the first quarter of 2009. <br /> - There was no backfilling or grading completed in the West Pit since the last <br /> inspection on 10 November 2008. <br /> Topsoil: - The Bower Brothers and Anson topsoil stockpiles that are along the Section <br /> 16 Pit area have been sloped and seeded. Additionally, these topsoil stockpiles <br /> have had a perimeter ditch cut around them to protect the topsoil resource. <br /> Colowyo needs to take extra care with these piles because of their extremely close <br /> proximity to the road. <br /> General Mine Plan Compliance: - The 101 dragline is on the East Pit highwall where it <br /> was waiting to performing reclamation (although it has not been running for several <br /> months). <br /> - The 102 dragline was working in the West Pit removing overburden. <br /> - The 103 dragline was working in the West Pit removing overburden. <br /> - The 114 shovel operation was working on removing X-Seam overburden in the X-Pod <br /> area. <br /> - The 115 excavator was also working on removing X-Seam overburden in the X-Pod <br /> area. <br /> - The operator was dumping overburden from the X-Pod area into C-C' drain area of <br /> the East Taylor fill. <br /> - The mining at the Colowyo Mine appears to be progressing as discussed and <br /> approved in the PAP. <br />