Colowyo C-1981-019 <br /> 9 December 2008 <br /> Pg 2/4 � <br /> Hydrologic Balance (cont.): - The Gossard Pond (NPDES 003A) contained water <br /> approximately three feet below the riser pipe and was not discharging at the time of <br /> the inspection. The pond embankment was well vegetated and appeared to be <br /> stable at the time of the inspection. No erosional problems noted on the <br /> embankment at the time of the inspection. <br /> - The West Pit Pond (NPDES 008A) contained a small amount of water (approximately <br /> three feet below the bottom of the gated valve on the riser pipe at the bottom of the <br /> pond) at the time of the inspection. The presettling sump at the inlet of the pond also <br /> contained a small amount of water but it was not discharging into the main part of <br /> the pond. The pond embankment was well vegetated and appeared to be stable <br /> at the time of the inspection. No erosional problems noted on the embankment at <br /> the time of the inspection. <br /> - The Rail Loop Pond (NPDES 006A) contained water approximately two feet below <br /> the gated pipe and was not discharging at the time of the inspection. The pond <br /> embankment was well vegetated and appeared to be stable at the time of the <br /> inspection. No erosional problems noted on the embankment at the time of the <br /> inspection. <br /> - The Stoker Siding Pond (NPDES 005A) was not inspected due to the snow. <br /> - The East Taylor Pond (NPDES O1 OA) contained a small amount of water (about 1/2 <br /> way up the gated valve on the bottom of the riser pipe at and 7 feet below the top <br /> of the pipe) at the time of the inspection and was not discharging. The pond <br /> embankment was well vegetated and appeared to be stable at the time of the <br /> inspection. No erosional problems noted on the embankment at the time of the <br /> inspection. <br /> - The Prospect Pond (NPDES 007A) was not accessible at the time of the inspection. <br /> Anson was on site cleaning the pond. Because of the weather they were not able to <br /> dredge the pond but they were working on building up berms on the access road to <br /> the pond. They have also graveled the road to keep from spreading mud onto <br /> Colorado Highway 13 (as requested by CDOI). Anson has a long-boom excavator <br /> with a 1/2 yard bucket on site. <br /> - The Gulch A Pond (NPDES 004A) was not inspected due to the snow. <br /> - The Section 16 Pond (NPDES 009) was inaccessible and not inspected (and will <br /> probably remain inaccessible until late spring. <br /> - The Streeter Pond (NPDES 001 A) contained water approximately two feet below the <br /> discharge pipe and was discharging through the weep hole at the time of the <br /> inspection. The discharge appeared to be clear. The pond embankment was well <br /> vegetated and appeared to be stable at the time of the inspection. No erosional <br /> problems noted on the embankment at the time of the inspection. The Streeter Pond <br /> is scheduled to be cleaned this winter after the Prospect Pond is cleaned. <br /> - The Section 28 Pond (NPDES 012A) was not inspected because of the snow cover <br /> on the Sturgeon road. <br />